SWI conducted coastal investigations in 2010 and designs aimed at stabilizing the shoreline and enhancing the beach in the vicinity of the Terrace Restaurant at the Rendezvous Resort. The proposal was approved by the management of the resort and the investigations were conducted, including the preparation of design options, which were presented in a preliminary design report.
For whatever reason, the shoreline stabilization and beach enhancement works were not executed, and shoreline erosion continued. In 2014 the push for shoreline stabilization works was re-ignited and the preliminary designs developed in 2010 were modified so that a more holistic approach was employed and implemented.
CoastalMDB was contracted to execute the construction phase of the project. The construction was carried out over a limited time period to reduce the closing period for the resort.
For whatever reason, the shoreline stabilization and beach enhancement works were not executed, and shoreline erosion continued. In 2014 the push for shoreline stabilization works was re-ignited and the preliminary designs developed in 2010 were modified so that a more holistic approach was employed and implemented.
CoastalMDB was contracted to execute the construction phase of the project. The construction was carried out over a limited time period to reduce the closing period for the resort.